
The Empire State Line Project
NEETNY was selected in 2017 to build the Empire State Line; a new 20-mile, 345 kV electric power line with two new substations that utilize existing utility rights-of-way in Erie and Niagara counties.
NEETNY was selected in 2017 to build the Empire State Line; a new 20-mile, 345 kV electric power line with two new substations that utilize existing utility rights-of-way in Erie and Niagara counties.